Island 10 is scheduled for completion before Christmas. The channels all around the island have been excavated to depth. The infrastructure: power, water, sewer and phones, is being installed. The banks around the island are being sloped in preparation for the rock covering. Those of you who have and will purchase on Island 10 will be able to begin home construction after the first of the year.
If you haven't toured or haven't returned for a second tour, now is the time. This is the fun stuff: seeing your town being built. You will have another "I remember when" story for the grandkids.
Here's a photo showing the driveway on island 10 being built.
No comments:
Post a Comment